HOW TO WRITE A PROJECT PROPOSAL


Once the groundwork has been completed or an RFP (Request For Proposal), has been received, a proposal writing can commence. The key decision to be made at this stage is the structure of the project proposal (including the content and length). The structure is determined by the nature of the project as well as by the funding agency’s requirements. In the variety of formats, application forms, project design outlines, and grant application guidelines, it is possible to detect some common elements.

Proposed Format
Title page
A title page should appear on proposals longer than three to four pages. The title page should indicate the project title, the name of the lead organization (and potential partners, if any), the place and date of project preparation and the name of the donor agency to whom the proposal is addressed.
Project title
The project title should be short, concise, and preferably refer to a certain key project result or the leading project activity. Project titles that are too long or too general fail to give the reader an effective snapshot of what is inside.
Contents page
If the total project proposal is longer than 10 pages it is helpful to include a table of contents at the start or end of the document. The contents page enables readers to quickly find relevant parts of the document. It should contain the title and beginning page number of each section of the proposal.
Abstract
Many readers lack the time needed to read the whole project proposal. It is therefore useful to insert a short project summary — an abstract. The abstract should include:
• The problem statement;

• The project’s objectives;

• Implementing organizations;
• Key project activities; and

• The total project budget.
Theoretically, the abstract should be compiled after the relevant items already exist in their long form.
For a small project the abstract may not be longer than 10 lines. Bigger projects often provide abstracts as long as two pages.
Project Context
This part of the project describes the social, economic, political and cultural back- ground from which the project is initiated. It should contain relevant data from research carried out in the project planning phase or collected from other sources. The writer should take into consideration the need for a balance between the length of this item and the size of the overall project proposal. Large amounts of relevant data should be placed in an annex.
Project justification
Rationale should be provided for the project. Due to its importance usually this section is divided into four or more sub-sections.
Problem statement
The problem statement provides a description of the specific problem(s) the project is trying to solve, in order to “make a case” for the project. Furthermore, the project proposal should point out why a certain issue is a problem for the community or society as a whole, i.e. what negative implications affect the target group. There should also be an explanation of the needs of the target group that appear as a direct consequence of the described problem.
Priority needs
The needs of the target group that have arise, as a direct negative impact of the problem should be prioritized. An explanation as to how this decision was reached (i.e. what criteria was used) must also be included. For example, if the problem is stated as “... poor infrastructure in the community” the list of needs associated with this problem may be:
   Improved water supply in quality and quantity; 

   Better roads; and 

   Improved solid waste collection. 

These three needs would then be given higher or lower priority according to the level of importance for the community, and a description would be given of how that decision was reached (e.g. a poll taken from the local population, costs associated with project intervention, etc.). This procedure provides credibility to the selected intervention. 

The proposed approach (type of intervention)
The project proposal should describe the strategy chosen for solving the problem and precisely how it will lead to improvement. 
One way to describe the approach related to the need previously stated as improved water supply could be: “intervention to provide basic water supply facilities in the com- munity,” with some description of the specific features of the solution proposed. 

The implementing organization
This section should describe the capabilities of your organization by referring to its capacity and previous project record. Describe why exactly your organization is the most appropriate to run the project, its connection to the local community, the constituency behind the organization and what kind of expertise the organization can provide. If other partners are involved in implementation provide some information on their capacity as well.

Project aims
The first issue to deal with is naming the objectives. Several other English terms may be used including “project goal/aim,” “project purpose,” etc. Often one major “goal” is declared and then broken down into various objectives.
Once this issue has been dealt with, the hierarchy between objectives needs to be established, as well as how many levels the hierarchy should present. In reality, an organization should have already resolved this issue in the project-planning phase.
Project goal (or overall objective)
This is a general aim that should explain what the core problem is and why the     project is important, i.e. what the long-term benefits to the target group are.
Some examples of a project goal might be:
   Raising environmental awareness; 

   Improving the quality of life in the community; and 

   Fostering social empowerment among women from deprived rural areas. 

Some rules for setting a project goal are shown below in italic. If it is difficult to follow these rules then the project itself may have to be redefined or reconsidered.
            Rules for
Setting a Project Goal
ü  There should be only one goal per project. 

ü  The goal should be connected to the vision for development. 

It is difficult or impossible to measure the accomplishment of the goal using measurable indicators, but it should be possible to prove its merit and    contribution to the vision.
Project objectives
The objectives should address the core problem in terms of the benefits to be received by the project beneficiaries or target group as a direct result of the project as shown in Figure 6. The objectives from Figure 5 may be defined as:
   Improving the water supply in quantity X and quality Y for the population of village Z; and 

   Reducing by X the rate of acute infections. 

Project objectives provide a more detailed breakdown of the project goal. A project will likely have multiple objectives. 

Project results
Results describe the services or products to be delivered to the intended beneficiaries. This is what the project management is promising to deliver. The results are more detailed than the objectives and the goal, and should be possible to measure through the use of objective indicators. Special consideration should therefore be paid to this area.
The results should address the main causes of the problem that the target group faces. To ensure relevant results, project management should have correctly identified the group’s needs.
Relating back to the previous example, the results would be written as: 

• Increased number of households connected to the water supply system; and
• Increased number of water taps in the village.
Target group
Define the target group and show how it will benefit from the project. The project should provide a detailed description of the size and characteristics of the target groups, and especially of direct project beneficiaries.
The criteria for target group analysis may be ethnic composition, gender, age, etc. When these analyses are more elaborate, they may be attached as an appendix.
Project implementation
The implementation plan should describe activities and resource allocation in as much detail as possible. It is exceptionally important to provide a good overview of who is going to implement the project’s activities, as well as when and where. The implementation plan may be divided into two key elements: the activity plan and the resource plan.
Activity plan (schedule)
The activity plan should include specific information and explanations of each of the planned project activities. The duration of the project should be clearly stated, with considerable detail on the beginning and the end of the project. Figure 7 breaks down the various steps involved in preparing an activity plan.
In general, two main formats are used to express the activity plan: a simple table and the Gantt chart.
A simple table with columns, as shown in Figure 8, for activities, sub-activities, tasks, timing and responsibility, is a clear, readily understandable format for the activity plan.
The Gantt Chart, a universal format for presenting activities in certain times frames, shows the dependence and sequence for each activity.
Resource plan
The resource plan should provide information on the means necessary to undertake the project. Cost categories are established at this stage in order to aggregate and summarize the cost information for budgeting.
Budget
In simple terms, a budget is an itemized summary of an organization’s expected income and expenses over a specified period of time.
Budgeting forms and financial planning procedures vary widely, especially in the non-profit sector. It is nevertheless essential that financial officers comply clearly and punctually with a funding organization’s budgeting and reporting requirements.
The two main elements of any budget are income and expenditures.
Income (sometimes referred to as revenue) is the amount of financial assets and in- kind contribution used as sources of support for the project. If the funding source is unique, the income side of the budget may not be shown. However, many projects have more than one source of support. The income side should show the share of contribution of each of these sources.
Expenditures (also called expenses or costs) are all the costs that are anticipated to occur during the project’s implementation. Regardless of the calculation and classification criteria used, the project costs should present a reasonable reflection of the activities presented in the project proposal.
A projection of the specific amounts of time needed at different phases of project implementation represents a basis for calculating the spending dynamics at different periods of the project.
Budget categories classify expenditures into smaller groups according to a certain criteria. This is to monitor spending and ensure compliance with the plan.
The two main costs are direct costs and operational costs. Direct costs are associated with a certain activity (e.g. organizing a workshop). Operational costs are related to internal activities of an organization and are considered fixed costs in the short term (e.g. staff salaries, rent, utilities, etc.).
Units, quantity per period and estimated unit costs are the three elements that are needed to calculate costs associated with any of these categories.
Monitoring and evaluation
The basis for monitoring is set when the indicators for results are set. The project proposal should indicate:
   How and when the project management team will conduct activities to monitor the project’s progress; 

   Which methods will be used to monitor and evaluate; and 

   Who will do the evaluation? 


Reporting
The schedule of project progress and financial report could be set in the project proposal. Often these obligations are determined by the standard requirements of the donor agency. The project report may be compiled in different versions, with regard to the audience they are targeting.
Management and personnel
A brief description should be given of the project personnel, the individual roles each one has assumed, and the communication mechanisms that exist between them. All the additional information (such as CVs) should be attached to the annexes

Annexes
The annexes should include all the information that is important, but is too large to be included in the text of the proposal. This information can be created in the identification or planning phase of the project, but often it is produced separately. The usual documentation to be annexed to the project proposal is:
   Analysis related to the general context (e.g. a civil society sector assessment); 

   Policy documents and strategic papers (e.g. a local environmental action plan); 

   Information on the implementing organizations (e.g. annual reports, success stories, brochures and other publications) 

   Additional information on the project management structure and personnel (curriculum vitae for the members of the project team); 

   Maps of the location of the target area; and 


   Project management procedures and forms (organizational charts, forms, etc.) 



ASSIGNMENT:
You are required to prepare a project proposal to undertake a project. The project title is:

" To undertake an upgrading of a Shawl Boutique, exterior and interior of the  boutique in Bangsar South Area. You are allow to select an existing shop and turn into a Shawl Boutique. The Shawl Brand name is AKAR SCARF." AKAR SCARF has an existing online business and expanding to a Boutique outlet while having its online business."

Number words: 2,500 -3,000
Font :Arial
Size: 12
Spacing: 1.5

PRESENTATION
You are to select a project that will be launch in your real life. This presentation is a project presentation and you are required to present it to the key management of your company or to a project owner and project sponsor (This is a group presentation and group work but every member of the group must present).





Sunday, November 8, 2015

INTER-RELATION BETWEEN EXTERNAL ENVIRONMENT AND INTERNAL BUSINESS ENVIRONMENT



In cases of business failure or cash flow deficits in most organizations that I have been request to resolve is; there is no proper business model being developed which could relate between the business external environment and business internal environment. Sometimes the owner might says; yes there are. However soon after my research or my analysis, I found that it was not done.  

An example, where a project is being developed for a community where the project sponsors might spend an amount of money on the project development but the impact of the project is not as expected. In accounting it is said the ROI (return of investment) is low or even the ROI is negative. 

The question is why? My research finding is as above paragraph i.e. there are no linkage between the two components. The external and internal environment actually have a very strong, crucial bonding of which the interlinked is a must.   Having no linkages or even weak between these two environment will not contribute to a right revenue.


Some people questioned me, what are the external environment segments the we must linked on? My answer is simple. People-economy-enviroment. The three factors must be link to each other and hence the project will later be a successful project.

Assignment

Select a small and medium size company in Bangsar or Taman Tun. Analyst its internal and external environment. How does it interlinked and what are the strategy adopted by this company? Explain and justify your stand.

Font: Arial
Word counts: 3000
Size: 12
Spacing: 1.5

Presentation:

Select a small business entity in your area. What is the company problems faces with their competitors? Explain how could you assist or resolve if you are being appointed as a new operation manager in the company.  


Sunday, August 16, 2015

Project Management Life Cycle and the needs of project manager’s knowledge of expertise


The process each manager follows during the life of a project is called the Project Management Life Cycle. A proven methodical life cycle is necessary to repeatedly implement and manage projects successfully.

During the life cycle of any project, proven and tested project management processes or best practices are should be initiated. The types and extent of processes initiated depend on the nature of the project, i.e. size, probability of failure and consequences of failure. Strong and effective leaders apply process to protect all projects.

Every project has a life cycle, with a beginning, a life and an end (defined by accomplishing the objective). The following defines a typical project life cycle  

1. Initiation  - identifying project objectives
2. Planning   - drawing a plan i.e. develop budgets, project task an d subtasks,     timeline etc.
3. Executing – execution and control
4. Closing Closeout – project handover


There are 9 major knowledge areas of project management that required expertise for all project managers. They are:

  1. Scope Management
  2. Communications Management
  3. Risk Management
  4. Human Resources Management
  5. Procurement Management
  6. Time Management
  7. Cost Management
  8. Quality Management ƒ
  9. Integration Management

Each of these management areas consists of processes, tools and techniques that are produced and/or applied to some degree during the course of any project.

Assignment question:
You are required to submit a project proposal in detail for a grand opening of a boutique in Damansara Area. The place that you choose would be considered as the area where the owner has its boutique operates. The project owner and project sponsor is the same person. In  a norm situation, a project proposal is after the problem identification, identifications of needs, RFP and solution. The solution would be considered as the Project Proposal.

Font: Arial
Size : 12
Word counts: 2-500 - 3,000 words.

Presentation:
Your project proposal on the grand opening of the boutique has been accepted and the  project owner wants to open a boutique in Damansara Area.  You are to present this project proposal to the project owner. 

Slides : 5-7 slides


Sunday, June 28, 2015

How to analyse a company performance or identifying its strategy's effectiveness



A process is not a merely words to express a certain flow of activities in business such as production, services; it actually involves all parts of our life. Cooking such baking a cake, marriage, business services; construction, education provider, transportation are having processes within its activities.And hence process is important in our life.  

Some people might also address it as flow process and lately people are using the 'value chain' which turn many people to confusion state. So the questions is what all these words means and how it is related to strategy?

business process is a collection of linked tasks which find their end in the delivery of a service or product to a client. A business process has also been defined as a set of activities and tasks that, once completed, will accomplish an organizational goal.

Values chain is a high-level model of how businesses receive raw materials as input, add value to the raw materials through various processes, and sell finished products to customers. In value chain normally the financial part is inserted and hence efficiency is one of the important discussion in value chain analysis. 
Chart 1. A tool that could be use as a value chain analysis

Value-chain analysis looks at every step a business goes through, from raw materials to the eventual end-user. The goal is to deliver maximum value for the least possible total cost. 


Chart 2. An example Value Chain in use in manufacturing
Chart 3. Another example Value Chain in action

From above charts of value chain we could see that how value chain are being used from the base chart of Porters value Chain in chart 1 and later how it is being used in manufacturing in chart 2.


In turn around of companies from loss to profit or profit maximization for a company process, a few tools are being use such as; external analysis, competitors analysis, internal analysis such as resource evaluation analysis, . One of the most important tools in internal analysis is the value chain analysis which is being used as one of the analysis tools to evaluate efficiency and later transpired the process to profitability value.

It is important to remember that in analyzing a company's operations or proposing actions for a company to undertake in ensuring its profitability; a few tools needed. In a normal practice, the process of the action should be:
  1. Analyzing the company general operation - what are they doing?
  2. Analyzing the external environment
  3. Analyzing its internal environment
  4. Identify what strategy are they using or suppose to use.
 5. How does the organization chart related to the strategy? Is it very much linked?
  6. Analyse its value chain
 7. Is the strategic implementation effective- look at the 10 components of  strategic 
      implementation - is it being applied (Thomson 2011).
  8. What is the finding from all those analysis above and you can provide a
      comments and propose action to be taken for an improvement.

In most cases if we use all the above tools or methodology, we are able to resolve the company non performance or improving its profitability. This could be applied to any size of the company.

Assignment
Fashion design has been a new life style demand for generation Y. In the perspective of strategy, what could you explain in relation to external and internal environment of a company; if a fashion design house to be open in ARA DAMANSARA. What are the best strategic (business and corporate level) option. Explain in detail.

Note:
Font size: 12
Words count: 2500 - 3000
Spacing: 1.5

Presentation:
You are to select a small business entity or a SME. Analyze its operation.How is its performance? Provide the monitoring and control tools and method for continuos improvements. 

Note:
Prepare only 5-6 slides for this presentation. 

Thursday, June 11, 2015

3 critical activities in Managing a Project

Picture of Fremantle Port in Perth. Task are executed here with proper planning and
 following the 4 elements, as in this article.

Project management is a chain process of activity or a flow of  activity in ensuring a task is completed and meet the project sponsor and project owner requirement. A project owner might not be a project sponsor. 

Example, the owner of the project might be the state government but financed by the Federal Government. A simpler example, a wedding, the project owner might be the two bride to be but the financier or the project sponsor who finance mitt be the parents.

In being a project manager, these two parties must be satisfied to the project. And a project might be as big as a mega project in Oil and Gas and as small as wedding planning or a birthday party or even the annual anniversary celebration.

The question is how to ensure that the project will satisfy both parties, the project owner and the project sponsor. However it might also be only one party involve where the same party is the project owner and project sponsor.

In most books, the element or the important segments are:

a. Time: Project Schedule
b. Cost: Project Budget and expenses
c. Scope : the work scope; deliverable

In my experience, there is one more thing which important that is the quality. The question is how? Simple to say but need serious attention and focus. 

To ensure all the 3 elements are achieved or 4 as I mention the additional element (quality) is a proper monitoring and control. What to use? I will answer you, use the 7 QC Tools and intact, I have been using the control chart successfully. Remember; evaluation must be done periodically or as soon as any positive or negative spikes. 


Sample of control chart



The negative spikes is when it runs lower than the LLV (lower limit value) and positive spike is when the achievement is so good; beyond the target or even beyond the ULV (upper limit value). If you reed more or google the knowledge on using control chart, you will get what I meant by ULV and LLV. 

Thursday, April 16, 2015

Project Management ; Initial stage level


At the start of any project, there will be a variety of ideas and opinions about the purpose and scope of the project, what the final product of the project will be, and how the project will be carried out. The Project Initiation Stage is concerned with taking these ideas and intentions and developing them into a formal, planned, resourced and funded project. In order to define a project in this way, it is first necessary to clearly and explicitly define what the project is intended to achieve and what its scope of interest will be.
By defining this first, a benchmark is created for assessing the quality of what is actually produced at the end of the project. It is also necessary to develop a process by which the project objectives can be achieved. This process will typically involve carrying out a number of tasks and producing a number of products during the course of the project. The tasks produce the products. For clarity of purpose and for control reasons it is useful to arrange these tasks in a top down structure, which progressively specify the required work in more detail.
This is called a work breakdown structure. LBMS provides a series of standard work breakdown structures for strategic planning and applications development. However, it is important to look for opportunities to customize this for the particular circumstances of the project and its objectives. The work breakdown structure will provide a benchmark by which the quality of the project process can be assessed.

The Project Initiation Stage must also define what resources and associated time commitment are required to carry out the project. The work breakdown structure provides a basis from which this estimation can be carried out. The resource and time commitment can be used to calculate an end date for the project and an estimate of its cost. This information is key input into the establishment of a business case for the intended project.
The overall project schedule is not at a sufficient level of detail to enable the allocation of actual resources to tasks, or to control progress. It is necessary to produce a more detailed plan for these purposes. This detailed plan is only produced for the next stage of the project, usually covering an elapsed time of two to four months.
The way the project is managed and executed is the key to its success. The involvement of the right people for data capture and decision making is also crucial. It is necessary to identify and recruit these people at the start of the project and to define the project organization structure. It is also necessary to establish the procedures that will be used by the people in the Project Organization Structure to carry out and control the project work.

Finally, in order to establish a resourced and funded project, it is necessary to establish a clear and convincing business case for the project. This business case should be reviewed, and hopefully accepted by management. The business case will identify the projected benefits of meeting the objectives of the project, and balance these against the costs and risks associated with realizing these benefits. The business case can also be used as a benchmark to compare against actual results, costs and benefits in order to assess the ultimate success of the project.
The Project Initiation stage is described here as a sequence of steps. In reality, once the objective and scope have been defined, many of these steps occur in parallel, and the step products are developed iteratively, since there are many dependencies between the steps. It is necessary to plan the Project Initiation stage, albeit in an informal manner. Therefore it is important to create a Project Initiation Kick Off Plan scheduling the activities and resources.

Assignment:

Article Links for download:
Artikel untuk muat turun:
https://www.dropbox.com/sh/bw2w4u1p9ymi9te/AADRjinHBxT1CMBKtF_gCqa7a?dl=0


Note:
1. Assignments are all to be submitted in Bahasa Malaysia
2. Font: New Times Roman
3.Words: 800 - 1000 words
4. Spacing : 1.5
6. Submission date: week 6